ARMA SPEED
BMW Garage BMW Meets Register Today's Posts

Go Back   BMW M3 and BMW M4 Forum > BMW F80 M3 / F82 M4 Forum > F80 M3 / M4 Pricing, Ordering, European Delivery

Post Reply
 
Thread Tools Search this Thread
      12-09-2015, 11:03 AM   #1
Kossos
I want to belive
Kossos's Avatar
United_States
146
Rep
194
Posts

Drives: Unicorn
Join Date: Dec 2015
Location: NE Florida

iTrader: (0)

Your Estimated vs Actual Build Date

My dealer said my production number has an estimated build date of the first week in January.

How accurate was the estimated vs actual build date for you guys?
Appreciate 0
      12-09-2015, 11:47 AM   #2
Bmwguy11
Lieutenant Colonel
1252
Rep
1,760
Posts

Drives: 2016 YMB M3
Join Date: Aug 2011
Location: Wisconsin

iTrader: (1)

They are usually pretty accurate, unless there is a problem. Also your build week is the week your car will finish production. It'll start before then.
Appreciate 0
      12-09-2015, 12:08 PM   #3
kim6jj
Enlisted Member
8
Rep
41
Posts

Drives: 2016 F80
Join Date: Oct 2015
Location: DMV

iTrader: (0)

Got a prod # and called in (out of excitement) and BMW rep told me it was status 111 and would be 112 on the 5th of Feb and that was the only date I was provided.

Is this the build week? Or is the build week given to me at a later date? Was kind of confused as it was my understanding the production # already has an allocated build date associated with it.
Appreciate 0
      12-09-2015, 01:11 PM   #4
Bmwguy11
Lieutenant Colonel
1252
Rep
1,760
Posts

Drives: 2016 YMB M3
Join Date: Aug 2011
Location: Wisconsin

iTrader: (1)

Quote:
Originally Posted by kim6jj View Post
Got a prod # and called in (out of excitement) and BMW rep told me it was status 111 and would be 112 on the 5th of Feb and that was the only date I was provided.

Is this the build week? Or is the build week given to me at a later date? Was kind of confused as it was my understanding the production # already has an allocated build date associated with it.
call BMW genius and ask for your BUILD WEEK.
Appreciate 0
      12-10-2015, 07:34 AM   #5
mhanism
Captain
mhanism's Avatar
United_States
277
Rep
807
Posts

Drives: 2020 M2C
Join Date: Jun 2013
Location: Irvine, CA

iTrader: (0)

Status 112 means the production week/schedule is determined, the build week would follow a couple weeks after that.
__________________
MY20 M2 Competition
MY16 M3 (Sold)
MY17 X3 35i M Sport
MY14 335i M Sport (Sold)
Appreciate 0
      12-10-2015, 08:11 AM   #6
Adcampo
Lieutenant Colonel
United_States
885
Rep
1,663
Posts

Drives: G80 Manual
Join Date: Apr 2013
Location: Ashburn Va

iTrader: (1)

Quote:
Originally Posted by Kossos
My dealer said my production number has an estimated build date of the first week in January.

How accurate was the estimated vs actual build date for you guys?
My car is on the ship, but it seems like they've been pretty accurate. It's actually a bit ahead of schedule by a few days. The Build thread from BMWGuy is really spot on and super helpful.

112 to 150 can take some time, but then it flies through.

Regardless, as mentioned already, BMW Genius should be able to tell you your build week.
__________________
18' F80 6MT, 991.1s cab PDK, F83 6mt, 996 C4S cab 6mt, F30 328iM 6mt
E60 M5 SMG, E39 M5, E46 M3 cab 6mt, E36 M3 5mt
Appreciate 0
      12-10-2015, 09:06 AM   #7
Bmwguy11
Lieutenant Colonel
1252
Rep
1,760
Posts

Drives: 2016 YMB M3
Join Date: Aug 2011
Location: Wisconsin

iTrader: (1)

Quote:
Originally Posted by mhanism View Post
Status 112 means the production week/schedule is determined, the build week would follow a couple weeks after that.
Not quite. Status 112 means scheduled for daily production pack. Initial scheduled Build week is determined the day the allocation is given to the dealership.

Last edited by Bmwguy11; 12-10-2015 at 09:20 AM..
Appreciate 0
      12-10-2015, 09:14 AM   #8
mhanism
Captain
mhanism's Avatar
United_States
277
Rep
807
Posts

Drives: 2020 M2C
Join Date: Jun 2013
Location: Irvine, CA

iTrader: (0)

Quote:
Originally Posted by Bmwguy11
Quote:
Originally Posted by mhanism View Post
Status 112 means the production week/schedule is determined, the build week would follow a couple weeks after that.
Note quite. Status 112 means scheduled for daily production pack. Initial scheduled Build week is determined the day the allocation is given to the dealership.
Interesting. I also got a production number last Friday, status 111 now, but was not given a build week. Guess I'll try the Genius # today.

Thanks!
__________________
MY20 M2 Competition
MY16 M3 (Sold)
MY17 X3 35i M Sport
MY14 335i M Sport (Sold)
Appreciate 0
      12-10-2015, 09:37 AM   #9
Sterrico
New VW CEO
United_States
73
Rep
280
Posts

Drives: 2011 135i
Join Date: Mar 2009
Location: Hyattsville, MD

iTrader: (2)

I was scheduled for week 47 and was at status 112. It actually went into production at week 50. No idea why the delay. Dealership and BMW NA couldn't tell me why. Some BS about my color and option combination.

Of course it pushed my car delivery into 2016 but then I got to thinking that I will pick up a 2016 in 2016 so maybe that is a little better. Probably not but................
__________________
Looking for the next ride.....
2011 135i
2016 M4 - Sold her.
2011.5 SG E90 - Loved her but totaled her.
2006 Z4M - Short but sweet stint
Appreciate 0
      12-10-2015, 09:48 AM   #10
Kossos
I want to belive
Kossos's Avatar
United_States
146
Rep
194
Posts

Drives: Unicorn
Join Date: Dec 2015
Location: NE Florida

iTrader: (0)

Quote:
Originally Posted by Adcampo View Post
112 to 150 can take some time, but then it flies through.
Good to know. My dealer swapped an allocation from another dealer so my process started with a production number at statues 112. Not really sure how long it was sitting at 112 but I'm expecting it to sit there at least another month.

We're going on vacation the middle of March so I'm trying to speculate if I'll get the car before then. The dealer will only speak vaguely as I'm sure they don't want to over promise.

This has already become the longest wait of my life and it hasn't even been a week.
Appreciate 1
      12-10-2015, 10:43 AM   #11
Adcampo
Lieutenant Colonel
United_States
885
Rep
1,663
Posts

Drives: G80 Manual
Join Date: Apr 2013
Location: Ashburn Va

iTrader: (1)

Quote:
Originally Posted by Kossos View Post
Good to know. My dealer swapped an allocation from another dealer so my process started with a production number at statues 112. Not really sure how long it was sitting at 112 but I'm expecting it to sit there at least another month.

We're going on vacation the middle of March so I'm trying to speculate if I'll get the car before then. The dealer will only speak vaguely as I'm sure they don't want to over promise.

This has already become the longest wait of my life and it hasn't even been a week.
There are better experts on here than me on this subject, but it's all about the allocation and production week. I believe if you're in status 112, they should be able to give you a production week, but I certainly could be wrong.

I hear you about the waiting. Calling BMW Genius every day, buying mods and adding to my order seemed to help some... But it's an expensive way to pass the time. I've been waiting since early October and my car is scheduled for delivery on 1/22 at PCD. It was scheduled for production week 48, but it finished a few days early and I expect it will arrive at the PCD a month before I'm scheduled to pick it up.

I hope getting the car exceeds my expectations and anticipation.
Appreciate 0
      12-10-2015, 10:58 AM   #12
mhanism
Captain
mhanism's Avatar
United_States
277
Rep
807
Posts

Drives: 2020 M2C
Join Date: Jun 2013
Location: Irvine, CA

iTrader: (0)

I just got off the phone with the "Genius" and they weren't able to provide the Build week. And I'm status 111... Hmm
__________________
MY20 M2 Competition
MY16 M3 (Sold)
MY17 X3 35i M Sport
MY14 335i M Sport (Sold)
Appreciate 0
      12-10-2015, 12:47 PM   #13
Kossos
I want to belive
Kossos's Avatar
United_States
146
Rep
194
Posts

Drives: Unicorn
Join Date: Dec 2015
Location: NE Florida

iTrader: (0)

Quote:
Originally Posted by Adcampo View Post
There are better experts on here than me on this subject, but it's all about the allocation and production week. I believe if you're in status 112, they should be able to give you a production week, but I certainly could be wrong.

I hear you about the waiting. Calling BMW Genius every day, buying mods and adding to my order seemed to help some... But it's an expensive way to pass the time. I've been waiting since early October and my car is scheduled for delivery on 1/22 at PCD. It was scheduled for production week 48, but it finished a few days early and I expect it will arrive at the PCD a month before I'm scheduled to pick it up.

I hope getting the car exceeds my expectations and anticipation.
I know I have an estimated production week of the first week in January. Barring any issues with getting parts I should be good. I didn't get any Individual stuff and my build is pretty simple so I should be good to go.

I've already filled up my ECS Tuning wishlist with my post delivery items so now I'll just sit here and watch M4 YouTube videos and drive myself insane
Appreciate 0
      12-10-2015, 06:51 PM   #14
mhanism
Captain
mhanism's Avatar
United_States
277
Rep
807
Posts

Drives: 2020 M2C
Join Date: Jun 2013
Location: Irvine, CA

iTrader: (0)

I'm so with you on this! Week 5 build, Order Status 111. Been about a week since my order was accepted by BMW AG.

I'm hoping the build week bumps up into January, esp since i'm at Priority 1 - Customer Sold... *fingers crossed*

Quote:
Originally Posted by Kossos View Post
Good to know. My dealer swapped an allocation from another dealer so my process started with a production number at statues 112. Not really sure how long it was sitting at 112 but I'm expecting it to sit there at least another month.

We're going on vacation the middle of March so I'm trying to speculate if I'll get the car before then. The dealer will only speak vaguely as I'm sure they don't want to over promise.

This has already become the longest wait of my life and it hasn't even been a week.
Appreciate 0
      12-11-2015, 10:51 AM   #15
Bmwguy11
Lieutenant Colonel
1252
Rep
1,760
Posts

Drives: 2016 YMB M3
Join Date: Aug 2011
Location: Wisconsin

iTrader: (1)

Quote:
Originally Posted by mhanism View Post
I just got off the phone with the "Genius" and they weren't able to provide the Build week. And I'm status 111... Hmm
Try again. You occasionally might get someone who doesn't know how to look that up.
Appreciate 0
      12-11-2015, 03:37 PM   #16
mhanism
Captain
mhanism's Avatar
United_States
277
Rep
807
Posts

Drives: 2020 M2C
Join Date: Jun 2013
Location: Irvine, CA

iTrader: (0)

Thanks! My CA actually got back to me yesterday and told me it was a Week 5 Build - so first week of Feb. It's still in Status 111, so hoping it gets bumped up a few weeks...


Quote:
Originally Posted by Bmwguy11 View Post
Try again. You occasionally might get someone who doesn't know how to look that up.
Appreciate 0
      12-11-2015, 06:01 PM   #17
M2PDX
Lieutenant Colonel
United_States
2943
Rep
1,611
Posts

Drives: 2017 M2
Join Date: Aug 2013
Location: Portland, Oregon

iTrader: (0)

Make sure your order is final. My car went into production three weeks earlier than my dealer expected, and so we didn't have a chance to make any changes to the options. I was going to add the Executive Package, but didn't get the chance. In my case, BMW might have moved it up to line it up with other Ms that were being painted San Marino Blue, so they could do several at the same time. If you're not doing an individual color, this may not be an issue for you.
__________________
'17 M2 San Marino Blue, 6MT; 2011 335iS, 2007 328i, 19 Ram 1500, '18 Yamaha MT-07, '14 Kawasaki Ninja 1000. SOLD: '16 European Delivery M3 San Marino Blue, 6MT. '13 335iS, 2002 M3 6MT, 1997 M3, 1998 M3, 1996 328is (picked up in Munich at OLD ED Center), '88 Mustang GT 5.0, '84.5 Mustang SVO Turbo, '77 Rabbit,a cool 1992 Taurus SHO, and KTMs.
Appreciate 0
      12-11-2015, 06:27 PM   #18
MadZarBMR
Captain
MadZarBMR's Avatar
United_States
712
Rep
924
Posts

Drives: Current: '18 M3 ZCP - 6MT
Join Date: Jan 2013
Location: SFBay, CA

iTrader: (3)

Quote:
Originally Posted by Kossos View Post
My dealer said my production number has an estimated build date of the first week in January.

How accurate was the estimated vs actual build date for you guys?
I also started with Nov allocation with a production # at status 112 and was immediately given a week 51 build date. I was lucky and found a dealer allocation that was converted from priority 2 to 1. Dealer even attempted to have the build pushed up to week 49, but was unsuccessful.

Genius confirmed today that car went into production (status 150) on 12/8 and is scheduled for completion on 12/18. My understanding is you do not get a build week until it goes to status 112 when it is assigned to a production pack.

I also had two other dealers tell me in November that they had production # with Jan week 1 build date. One could not produce a valid production # and the other only provided a # at status 47 which I learned meant order was in BMW NA system, but no allocation from BMW AG was available. No way either of these dealers had a week 1 production # - both were obviously lying to get my business.

I am thankful this forum exists to keep us all in the know. Best of luck!
Appreciate 0
      12-13-2015, 02:34 PM   #19
Kossos
I want to belive
Kossos's Avatar
United_States
146
Rep
194
Posts

Drives: Unicorn
Join Date: Dec 2015
Location: NE Florida

iTrader: (0)

Quote:
Originally Posted by MadZarBMR View Post
I also started with Nov allocation with a production # at status 112 and was immediately given a week 51 build date. I was lucky and found a dealer allocation that was converted from priority 2 to 1. Dealer even attempted to have the build pushed up to week 49, but was unsuccessful.

Genius confirmed today that car went into production (status 150) on 12/8 and is scheduled for completion on 12/18. My understanding is you do not get a build week until it goes to status 112 when it is assigned to a production pack.

I also had two other dealers tell me in November that they had production # with Jan week 1 build date. One could not produce a valid production # and the other only provided a # at status 47 which I learned meant order was in BMW NA system, but no allocation from BMW AG was available. No way either of these dealers had a week 1 production # - both were obviously lying to get my business.

I am thankful this forum exists to keep us all in the know. Best of luck!

This is my exact situation. I got a November allocation with a week 1 build week and was converted to a priority 1. Can't wait till mine goes 150
Appreciate 0
      12-13-2015, 08:29 PM   #20
frankiepots
Enlisted Member
frankiepots's Avatar
13
Rep
38
Posts

Drives: 2016 AW F80
Join Date: Nov 2015
Location: QUEENS NY

iTrader: (1)

my dealer also told me week 1 but the 800 number states, confirmed production with no build date...
Appreciate 0
      12-14-2015, 08:08 AM   #21
Bmwguy11
Lieutenant Colonel
1252
Rep
1,760
Posts

Drives: 2016 YMB M3
Join Date: Aug 2011
Location: Wisconsin

iTrader: (1)

Quote:
Originally Posted by MadZarBMR View Post
Genius confirmed today that car went into production (status 150) on 12/8 and is scheduled for completion on 12/18. My understanding is you do not get a build week until it goes to status 112 when it is assigned to a production pack.
This is not correct. The "tentative/scheduled" build week is assigned to the allocation when it is given to the dealer. The dealer then either has to sell the allocation by the time the build week comes, or else they have to configure the car and take the allocation as a P2 (dealer stock) car. If they do neither, they lose the allocation.

I knew my build week the day I got my production number and allocation. And my car sat in status 111 for weeks.
Appreciate 0
      12-14-2015, 08:09 AM   #22
Bmwguy11
Lieutenant Colonel
1252
Rep
1,760
Posts

Drives: 2016 YMB M3
Join Date: Aug 2011
Location: Wisconsin

iTrader: (1)

Quote:
Originally Posted by frankiepots View Post
my dealer also told me week 1 but the 800 number states, confirmed production with no build date...
Don't call the 1800 number. It is always behind and never gives you any details. Call BMW genius to ask for your tentative build week for your production number.
Appreciate 0
Post Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 10:10 AM.




f80post
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
1Addicts.com, BIMMERPOST.com, E90Post.com, F30Post.com, M3Post.com, ZPost.com, 5Post.com, 6Post.com, 7Post.com, XBimmers.com logo and trademark are properties of BIMMERPOST