01-18-2016, 10:53 AM | #2 |
Member
458
Rep 1,517
Posts |
I would think 6-8 weeks more. It will take your car about a week or two to get to the port and then onto a boat. Then I believe its 45 days or so to get to cali. I could be wrong.
__________________
Previous: 2013 135i Space Grey w/Coral Red | 6 Speed MT | M Pkg | JB4 | AA Downpipes | AA Exhaust |
Previous: 2015 M3, BSM[/SO/CF | DCT | Adaptive M | 19" Black | CF Roof | Previous: 2018 M2, AW | DCT | Exec Pkg Current 2020 X7 50i |
Appreciate
0
|
01-18-2016, 12:21 PM | #3 | |
Brigadier General
2253
Rep 3,622
Posts |
Quote:
__________________
BMW CCA Member #516012
2016 340i, Estoril Blue, Manual Transmission, MPE, MPBBK, HRE FF04 Instagram: @brandons340i |
|
Appreciate
0
|
01-18-2016, 12:24 PM | #4 | |
Brigadier General
2253
Rep 3,622
Posts |
Quote:
__________________
BMW CCA Member #516012
2016 340i, Estoril Blue, Manual Transmission, MPE, MPBBK, HRE FF04 Instagram: @brandons340i |
|
Appreciate
0
|
01-18-2016, 01:39 PM | #5 | |
Member
458
Rep 1,517
Posts |
Quote:
It's going to be about another couple days before his car out of production and then to the port, that's about a week. Then 1-2 weeks waiting for the next ship. Then 3-4 weeks travel time, then a week to leave port, inspection and transport to dealer. So yes, 6-8 weeks before he gets the car, not travel time.
__________________
Previous: 2013 135i Space Grey w/Coral Red | 6 Speed MT | M Pkg | JB4 | AA Downpipes | AA Exhaust |
Previous: 2015 M3, BSM[/SO/CF | DCT | Adaptive M | 19" Black | CF Roof | Previous: 2018 M2, AW | DCT | Exec Pkg Current 2020 X7 50i |
|
Appreciate
0
|
01-18-2016, 03:23 PM | #6 | ||
Brigadier General
2253
Rep 3,622
Posts |
Quote:
__________________
BMW CCA Member #516012
2016 340i, Estoril Blue, Manual Transmission, MPE, MPBBK, HRE FF04 Instagram: @brandons340i |
||
Appreciate
0
|
02-05-2016, 09:32 AM | #9 |
Banned
1770
Rep 6,696
Posts
Drives: F30 340i
Join Date: Jan 2009
Location: San Diego,CA
|
Why do I feel like 340 owners got their cars in or under 8 weeks? Mine is taking forever. Placed my order January 1st and is currently waiting to be placed on a boat.
|
Appreciate
0
|
02-05-2016, 10:53 PM | #10 |
2JZ-GTE
3045
Rep 3,996
Posts |
76 days for me.
|
Appreciate
0
|
02-14-2016, 04:45 PM | #12 |
Member
458
Rep 1,517
Posts |
You don't have a production number?
__________________
Previous: 2013 135i Space Grey w/Coral Red | 6 Speed MT | M Pkg | JB4 | AA Downpipes | AA Exhaust |
Previous: 2015 M3, BSM[/SO/CF | DCT | Adaptive M | 19" Black | CF Roof | Previous: 2018 M2, AW | DCT | Exec Pkg Current 2020 X7 50i |
Appreciate
0
|
02-15-2016, 06:54 AM | #13 |
New Member
5
Rep 12
Posts |
Nope, i plan to bug him today, but i dont really get the feeling he gives a damn... I've asked him for details and just keeps saying 'weeks'... I think he's pushing other cars infront of mine in the queue really..
|
Appreciate
0
|
02-15-2016, 09:44 AM | #14 |
I'll Kung Fu Panda your ass
106
Rep 2,100
Posts |
Is your built in Germany or SA? If its build in Germany, roughly 4-6 weeks. SA build will take longer like 8 weeks. Mine was built in SA. I order in beginning of Aug, took a week to built, sent to port - took a month for a boat like mid Sept (boat came straight to US, didn't stop in Germany - SA has 2 boats a month - nonstop & stops in Germany) and it arrived in NJ early Oct. I pick it up late Oct. Hope this helps.
__________________
'16 F30 340 XDrive - AW-Lighting & Track Packages. The FIRST drive was awesome....
|
Appreciate
0
|
02-15-2016, 09:58 AM | #15 | |
New Member
5
Rep 12
Posts |
Quote:
Not particularly impressed with this salesman |
|
Appreciate
0
|
02-15-2016, 12:28 PM | #16 | |
Member
458
Rep 1,517
Posts |
Quote:
You need to start calling other dealers and having them match that deal, or do better if they can give you a production number that day. I've read too many stories on here of people being promised a number but the dealer just drags them on. Until you have that production number with your name attached to it, he basically has sold you air. No #, no deal.
__________________
Previous: 2013 135i Space Grey w/Coral Red | 6 Speed MT | M Pkg | JB4 | AA Downpipes | AA Exhaust |
Previous: 2015 M3, BSM[/SO/CF | DCT | Adaptive M | 19" Black | CF Roof | Previous: 2018 M2, AW | DCT | Exec Pkg Current 2020 X7 50i |
|
Appreciate
0
|
02-16-2016, 11:21 AM | #17 | |
New Member
5
Rep 12
Posts |
Quote:
Thanks for the advice! |
|
Appreciate
0
|
02-16-2016, 12:15 PM | #18 |
Member
458
Rep 1,517
Posts |
Great to hear!
__________________
Previous: 2013 135i Space Grey w/Coral Red | 6 Speed MT | M Pkg | JB4 | AA Downpipes | AA Exhaust |
Previous: 2015 M3, BSM[/SO/CF | DCT | Adaptive M | 19" Black | CF Roof | Previous: 2018 M2, AW | DCT | Exec Pkg Current 2020 X7 50i |
Appreciate
0
|
02-16-2016, 05:50 PM | #19 |
Second Lieutenant
84
Rep 236
Posts |
I'm in the same situation with OP. Placed order in December for January build (SA plant), salesman says end of March/beginning of April.
Do I harass him for the product number? Once I have the product number where can I track it? |
Appreciate
0
|
02-17-2016, 10:16 PM | #20 |
Private
8
Rep 64
Posts |
My 340i started production on Feb 8, on boat Feb 17...expected to be Halifax, NS on Feb 29, then about another 4 weeks on transport to dealer.
__________________
The Ultimate Driving Machine
2016 340i xDrive Premium package enhanced, M performance package, 624M |
Appreciate
0
|