Quote:
Originally Posted by WNC BMW
J-man - pretty sure Week 39 is production build-collection of Individual Options... like Full Merino Leather or the Piano Black trim. So even if your order was accepted and the dealer allocation was tagged for a Week 36 build, your status and production schedule would in the last few days have mysteriously slid to a Week 39 build.
|
Mine has the Ind Ash Trim. As of Friday, prod date was showing 9/4 (week 36). I hope it doesn’t slide.